About the park
We are developing our flagship 114.24 acres Grade A Logistics park in Bhiwandi, Maharashtra – the hub of Mumbai’s warehousing market. Our contiguous & confined premise has clear & marketable title with all necessary approvals underway.
Quick facts
Location
Bapgaon and Lonad, Bhiwandi, Maharashtra
Coordinates
Total Project Area
114.24 Acres
Total Built-Up Area
23.7L Sq.ft.
Project Consultants
PMC pre-construction: CBRE Engineering Consultants: Tata Consulting Engineers Master planning & Architecture: Venkataramanan Associates Logistics Consultant: Miebach ConsultantsEnquire with us
General Enquiries
For Land/ Lease Enquiries
Thank you for your interest and faith in sharing lead details with us.
To build on the level of transparency and enhance communication with you, each of our partners can now register on our portal and introduce new leads for land transactions (Outright, JVs or DM options) or leads for fulfilling warehouse lease requirements across India.
Click on the link below to register.
About Bhiwandi, Thane
Bhiwandi is a prime warehouse micro market in the country, strategically located in the Mumbai Metropolitan region. It is a primarily consumption driven warehousing hub serviced by the Old Agra Road and the National Highway 3 (Mumbai - Nashik Highway).
Location Advantage
The site is situated in close proximity to Kalyan - off NH3, Mumbai-Nashik highway; in the warehousing micro-market between Mankoli & Padgha. It is strategically located and suited for occupiers who intend to serve the 26MM consumption base being well connected to Thane & Mumbai via NH3 and Navi Mumbai via NH4 and Thane Belapur road.
Off NH-3 and Kalyan Sape Road
6.5 kms from Kalyan Junction and 13 kms from Bhiwandi railway Junction
61 kms from JNPT (Nhava Sheva Port)
43 kms from Mumbai International and Domestic Airport
Master plan layout
Features
- Park Level Features
- Building Level Features
- Sustainability Features
Pre-built state-of-the-art
infrastructure to the last mile
connectivity (plug & play)
24x7 manned security gate with CCTV
& boom barrier at
main park entrance
Asphalt road for access and
internal circulation of 40.ft
containers
Power availability at the park to
supply power 1.25 KVA / 1000
Sq.ft.*
External lighting to common areas
and roads
Green belt with tree plantations
and drip/sprinklers
irrigation system
Sewage Treatment Plant
Property management office
Driver's rest area & toilets
Fire fighting ring main loop with
fire hydrants, water storage
tank & pump room as per NBC standard
Rainwater harvesting
IOT based parking management
Structure
Wall
Truck Apron
Ventilation
Roof
Clear Height 12 mt.
Skylight
Parking
Dock Doors, &
Drive-In Doors
Power Load
Floor
Fire Detection
Solar Power
37% reduction in water usage by
using low flow fixtures
100% water treatment, 51% of it
will be used in irrigation
11% less consumption of electricity
w.r.t ECBC base case
96.1% of construction waste will be
diverted for reuse and recycle
68% of materials to be used in the
project will be eco-friendly